All · Projects

Projects

Varna WWTP

Engineering study to improve dewatering and recover the sludge.

Our most thorough sludge project. Worked with real data measured at the plant itself, not with design values from documentation.

What was done

  • The actual sludge figures before and after dewatering were recorded.
  • The operation of the working centrifuge and its regime were examined.
  • The polymers in use, their dosing rates and the scope for optimisation were reviewed.
  • The option of additional dewatering with a screw press was evaluated.
  • A press trial under real conditions was organised, with delivery and a supervisor from the manufacturer.
  • Drying, carbonisation, thermal treatment and phosphorus recovery were compared.
  • A complete configuration of the required equipment was sought.
  • Input data for the techno-economic assessment and the business plan were collected.

EKOTANK's role

  • Initiator and lead of the study. We collected the data, carried out the technical analysis and brought three separate European manufacturers around one task.
  • The German partners confirmed in writing the division of roles and EKOTANK's intended part in the implementation.

Projects

Work on real sites.

Bulgaria's largest treatment plants and heavy industry — with data measured on site.

Contact

Let's discuss the task.