All · Projects

Projects

Plovdiv WWTP

Preliminary technology study for sludge recovery.

The second track, run in parallel with Varna. The Plovdiv region has a substantial sludge volume and a published procedure for its recovery.

What is covered

  • Definition of the scale and the baseline parameters of the sludge.
  • Alignment of volumes with the makers of the applicable technologies.
  • Treatment of the project as a separate track alongside Varna.

What comes next

  • Analysis of sludge quality against the requirements in force.
  • Site inspection and assessment — space, infrastructure, available heat.
  • Economic parameters and comparison of the options.

Projects

Work on real sites.

Bulgaria's largest treatment plants and heavy industry — with data measured on site.

Contact

Let's discuss the task.